The system did not have available at the inspection an Emergency Operations Plan, a Microbiological Sample Siting Plan, and a lead and copper sampling plan.
02-28-2017
11-24-2020
FW
MIN
The area within 100 ft of the 130,000 gallons storage tank is not properly graded to provide drainage away from the base of the tank.