ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0414044

Federal Type:

NTNC

Water System Name:

ANTELOPE UNION HIGH SCHOOL

Primary Source:

SW

Principal County Served:

YUMA

System Status:

A - MAP

Comments:

Activity Date:

01-01-1976




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 INCREASED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 7/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES WERE COLLECTED (PRIOR TO THIS APPROVAL) DURING JULY 2014 AND 2015 (PRIOR TO THIS APPROVAL) WILL BE CREDITED TO THE SYSTEM. IN 2014 -2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A POE DUAL (TTHM & HAA5) **POE WILL NO LONGER BE AN ACCEPTABLE SAMPLING LOCATION FOR THE DISINFECTION BYPRODUCT RULE, AS THE RULE STATES THE SAMPLE MUST BE TAKEN IN THE DISTRIBUTION SYSTEM. BEGINNING IN 3RD QUARTER OF 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED EVERY 90 DAYS, AT TWO LOCATIONS (01-A AND 02-A) DURING THE SECOND MONTH OF EACH QUARTER (FEBRUARY, MAY, AUGUST(MONTH OF HIGHEST DBP CONCENTRATION), AND NOVEMBER). PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A DISTRICT OFFICE DUAL (TTHM & HAA5) 02-A AUDITORIUM DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013