THE STAGE 2 INCREASED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 7/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES WERE COLLECTED (PRIOR TO THIS APPROVAL) DURING JULY 2014 AND 2015 (PRIOR TO THIS APPROVAL) WILL BE CREDITED TO THE SYSTEM.
IN 2014 -2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A POE DUAL (TTHM & HAA5)
**POE WILL NO LONGER BE AN ACCEPTABLE SAMPLING LOCATION FOR THE DISINFECTION BYPRODUCT RULE, AS THE RULE STATES THE SAMPLE MUST BE TAKEN IN THE DISTRIBUTION SYSTEM.
BEGINNING IN 3RD QUARTER OF 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED EVERY 90 DAYS, AT TWO LOCATIONS (01-A AND 02-A) DURING THE SECOND MONTH OF EACH QUARTER (FEBRUARY, MAY, AUGUST(MONTH OF HIGHEST DBP CONCENTRATION), AND NOVEMBER).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A DISTRICT OFFICE DUAL (TTHM & HAA5)
02-A AUDITORIUM DUAL (TTHM & HAA5)
|