THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 7/7/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2006-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) VERY SMALL SYSTEM WAIVER (GRANTED ON 5/4/07), AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES WERE COLLECTED (PRIOR TO THIS APPROVAL) DURING JULY 2014 AND AUGUST 2015 (PRIOR TO THIS APPROVAL) WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
IN 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A POE DUAL (TTHM & HAA5)
**POE WILL NO LONGER BE AN ACCEPTABLE SAMPLING LOCATION FOR THE DISINFECTION BYPRODUCT RULE, AS THE RULE STATES THE SAMPLE MUST BE TAKEN IN THE DISTRIBUTION SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 15284 W. LEO ST. 85131 DUAL (TTHM & HAA5)
|