OT |
SIG |
|
The initial sample and repeat samples tested positive for TC were all taken at the time the well was being test pumped. The sample taken after the pumping was completed and the system was flushed at 2 points near the end of the system tested negative for TC. |
01-11-2018
|
01-11-2018
|