Deficiencies/Recommendations |
Category |
Severity |
Description Code Description Text |
Comments |
Determine Date |
Resolved Date |
SO |
MIN |
1 ->=1:500
|
The well head did not have a vent pipe that turns down and terminates at least two feet
above the slab with a non-corrodible #16 mesh screen |
08-24-2023
|
11-03-2023
|
MR |
SIG |
3 -Between 1:5,000 and 1:10,000
|
The system has failed to report its second quarter results for Arsenic monitoring. |
08-24-2023
|
09-28-2023
|
OT |
REC |
102 -Facility Center/Centroid
|
The pump room floor was dirty |
08-24-2023
|
11-03-2023
|
SO |
SIG |
105 -Treatment/Storage Plant
|
The well slab had no proper drainage or channeling around the well slab and the center of
the slab was not encased in concrete |
08-24-2023
|
11-03-2023
|
SO |
MIN |
1 -1
|
The well head did not have a vent pipe that turns down and terminates at least two feet
above the slab with a non-corrodible #16 mesh screen |
08-24-2023
|
11-03-2023
|
SO |
MIN |
1 -1
|
The well head did not have a vent pipe that turns down and terminates at least two feet
above the slab with a non-corrodible #16 mesh screen |
08-24-2023
|
11-03-2023
|
MR |
SIG |
3 -3
|
The system has failed to report its second quarter results for Arsenic monitoring. |
08-24-2023
|
09-28-2023
|
SE |
MIN |
|
The Arsenic treatment room was not secured with locks. Access to the well was not secured with locks. |
08-24-2023
|
09-28-2023
|
FW |
MIN |
|
No photographic evidence provided of a water tight hatch on both storage tanks secured
by a lock |
08-24-2023
|
11-03-2023
|
FW |
MIN |
|
No photographic evidence of a properly installed non-corrodible #16 mesh screen on the
steel storage tank air vent |
08-24-2023
|
11-03-2023
|
MR |
SIG |
|
At the time of inspection, the system could not provide a copy of an administratively correct
and current: Microbiological Sample Siting Plan (MSSP), Disinfectant By-Product Sample
Siting Plan (DBP Plan), and a Lead and Copper Site Sampling Plan (L & C Plan). |
08-24-2023
|
10-24-2023
|
SM |
MIN |
|
The raw water and EPDS sample taps had threaded variants installed along with a
vacuum breaker on the raw water sample tap. |
08-24-2023
|
11-03-2023
|
FW |
MIN |
|
Both storage tank lips and rings were covered by dirt, rocks, and debris |
08-24-2023
|
11-03-2023
|
FW |
MIN |
|
No photographic evidence provided of a properly installed and serviceable gasket or seal
on storage tanks ST001 and ST002 hatches |
08-24-2023
|
11-03-2023
|