The system is missing public notice distribution certifications for the following:
a. Missed additional chlorine sample due to triggered RTCR repeat samples.
b. Notices of LCR sampling issues from 2020 to present.
07-18-2024
11-15-2024
MR
MIN
A DBP plan was not completed after the DBP schedule was created by ADEQ CACs.
07-18-2024
08-01-2024
FW
MIN
The area around ST001 was not graded to provide drainage away from tank. The lip was buried by soil in the lowest grade spot.