PU |
REC |
|
Technical Basis: Per engineering Bulletin No. 10, Chapter 5, Section C, a minimum of 2 complete pumping stations shall be provided.
Recommendations: Install a second booster pump to meet the maximum instantaneous demand rate and so that a backup
pump will be available in the event of an emergency. |
04-05-2018
|
05-14-2020
|