OT |
SIG |
|
ISSUE DESCRIPTION: On August 11, 2020 Inspectors Steven Vogel and LaPriel Tohtonie arrived at the system to perform a Level 2 Assessment, issues that were noted are sampling locations were unsecured with vegetation close to both routine sampling spigots RTCR001 and RTCR002, and a boater damage the system's surface water intake line to the treatment plant which was sealed off prior to the assessment, system is operating with only one of two intake lines.
|
08-11-2020
|
08-11-2020
|