MRDL samples were being taken at the EPDSs (EPDS001 and EPDS002). The disinfectant residuals must be measured at the same time and the same location as each total coliform bacteria sample. Systems are required to submit a MRDL quarterly report (DWAR 18A) to ADEQ no later than 10 days after the end of each quarter. Moving forward, the system will be sampling at the correct locations, i.e., the same locations as each total coliform bacteria sample.
08-31-2017
SO
REC
There are small cracks on well 1 and well 2¿s slabs. Recommendation made to seal crack in wells' slabs.
08-31-2017
SM
SIG
The system has an MSSP with the routine locations listed and a map. The system operator, Michael Bovee, is working on providing the upstream and downstream locations and a revised map to ADEQ.
08-31-2017
09-14-2017
SO
REC
Well 2 ( Bright Star) has an opening where the old electrical conduit penetrates the slab.