OT |
SIG |
|
March routine sample was collected on 3/19/2023 and resulted in TC+/E.Coli-. Repeat sampled were not collected within 24 hours. Repeat samples at the site, upstream, and downstream locations were collected on 3/22/2023 and resulted in TC-/E.Coli-. The system had been treated with 12.5% sodium hypochlorite solution prior to repeat samples being collected. A well sample was not collected on 3/22/2023 as the raw water sample tap was below ground level and had been covered by debris. April routine sample was collected on 4/26/2023 and resulted in TC+/E.Coli-. A raw water tap was located and utilized for repeat samples on 6/28/2023 and resulted in TC+/E.Coli-. Subsequent routine samples since May 2023 have been TC-/E.Coli-. |
11-05-2023
|
11-06-2023
|