DS |
SIG |
|
Prior to microbiological test date of 6/5/17, 3 water meters were replaced. Pipe on both ends of meter were not disinfected and flushed. In the future pipe will be sanitized with 10% sodium hypochlorite before installation of new meter. This will be a standard operating procedure. |
07-24-2017
|
12-17-2019
|