OT |
SIG |
|
"Routine sample was taken on 11/24/19. Result was TC+/EC-. No repeat samples were taken. Drillers had been working on well 55-584422, planning to deepen it to increase the water supply. Upon removing a significant amount of silt that had accumulated in the well and resetting the pump, it was determined that the well actually produced an adequate supply. So, the deepening project was canceled and the well was placed back in operation. however, no disinfection was performed after this work. |
12-27-2019
|
12-31-2019
|