THE STAGE 2 ROUTINE SUMMARY SHEETS AND MAP (EDITED TO CORRECT 01-A SITE AND 02-A SITE) WERE APPROVED ON 6/6/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, COMPLIANCE MONITORING PLAN, AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED DURING 2015 MEET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TEN LOCATIONS (01-A THROUGH 10-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A GATE HOUSE DUAL
02-A SX MENS DUAL
03-A CRUSHER DUAL
04-A WAREHOUSE DUAL
05-A CORE STORAGE DUAL
06-A YARD MEN¿S DUAL
07-A ADMIN BLD DUAL
08-A 7 PLEX DUAL
09-A MINE OFF DUAL
10-A MINE MEN¿S DUAL
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER AND AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MO
|