THE ATTACHED STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/1/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, VSSW (GRANTED 2/11/2009) AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED PRIOR TO THE APPROVAL WILL BE CREDITED TO THE SYSTEM FOR 2014 (NO 2015 SAMPLING).
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED ANNUALLY, AT ONE LOCATION (01-A) DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A JED HUGHES HOUSE DUAL
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES (TTHM AND HAA5), COLLECTED ANNUALLY, AT TWO LOCATION (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 5017 PATTERSON MESA RD. DUAL
02-A 9374 COTTONWOOD RD. DUAL
|