DEAR PUBLIC WATER SYSTEM OWNER/OPERATOR,
THE ATTACHED STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 5/3/2017. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S MONITORING RESULTS FROM 2005-2016 AND THE COMPLIANCE MONITORING PLAN SUMMARY SHEET. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2015 AND 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 ROUTINE MONITORING CONSISTED OF 2 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE NAME SAMPLE TYPE
01-A GHC POU1 DUAL (TTHM & HAA5)
02-A GHC POU2 DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE NAMES TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE NAME SAMPLE TYPE
01-A GHC POU1 DUAL (TTHM & HAA5)
THE NEXT SAMPLES ARE DUE TO BE TAKEN IN JUNE 2017.
|