ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0412045

Federal Type:

NTNC

Water System Name:

CRISANTES GREENHOUSE WATER SYSTEM

Primary Source:

GW

Principal County Served:

SANTA CRUZ

System Status:

A - MAP

Comments:

Activity Date:

06-18-2013




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 10-01-2013 10-01-2013 N
DEAR PUBLIC WATER SYSTEM OWNER/OPERATOR, THE ATTACHED STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 5/3/2017. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S MONITORING RESULTS FROM 2005-2016 AND THE COMPLIANCE MONITORING PLAN SUMMARY SHEET. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2015 AND 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. IN 2014, STAGE 2 ROUTINE MONITORING CONSISTED OF 2 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY. SITE ID STAGE 2 COMPLIANCE MONITORING SITE NAME SAMPLE TYPE 01-A GHC POU1 DUAL (TTHM & HAA5) 02-A GHC POU2 DUAL (TTHM & HAA5) BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE NAMES TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE NAME SAMPLE TYPE 01-A GHC POU1 DUAL (TTHM & HAA5) THE NEXT SAMPLES ARE DUE TO BE TAKEN IN JUNE 2017.


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013