ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0415123

Federal Type:

C

Water System Name:

CIBOLA MUTUAL WATER COMPANY

Primary Source:

SW

Principal County Served:

LA PAZ

System Status:

A - MAP

Comments:

Activity Date:

08-01-2010




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 INCREASED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 8/24/15. THE SYSTEM WAS NOT SUBJECT TO THE STAGE 2 IDSE, SO APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2011-2013. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL IN 2013, 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED QUARTERLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTHS OF JANUARY, APRIL, JULY AND OCTOBER (MONTH OF HIGHEST DBP CONCENTRATION), BEGINNING IN THE 3RD QUARTER OF 2013. INCREASED MONITORING WILL CONTINUE UNTIL THE SYSTEM HAS QUALIFIED TO RETURN TO ROUTINE MONITORING. THE PWS MAY RETURN TO ROUTINE MONITORING ONCE THEY HAVE CONDUCTED INCREASED MONITORING FOR AT LEAST FOUR CONSECUTIVE QUARTERS, AND THE LRAA FOR EVERY MONITORING LOCATION IS ¿ 75% OF THE MCL, WHICH WOULD BE ¿ 0.060 MG/L FOR TTHM AND ¿ 0.045 MG/L FOR HAA5. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR EACH SITE: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID 01-A B&B STORE 01-B 65770 N. RICE


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
01-B DS001 Y 10-01-2013