THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 5/19/16. THE MAP NEEDS TO BE SCANNED IN COLOR AND WILL BE SENT IN A SEPARATE E-MAIL. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2012 AND 2013. THE SAMPLE COLLECTED DURING AUGUST 2014 (WITH THE RESAMPLE OF HAA5 IN SEPTEMBER) (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
|