ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0404341

Federal Type:

C

Water System Name:

QUAIL RUN WATER SYSTEM

Primary Source:

GW

Principal County Served:

GILA

System Status:

A - MAP

Comments:

Activity Date:

12-01-1973




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
DML FORMALLY APPROVED A STAGE 2 DBP CMP 12/09/2013 FOR THIS SYSTEM. AO1 09/23/2014 REVIEWED AND ASSOCIATED DBP2 SCHEDULE AND SAMPLE PLAN. AO1 02/06/2015 THE STAGE 2 REDUCED MONITORING SUMMARY SHEET WAS APPROVED ON 05/25/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014. STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED TRIENNIALLY, AT ONE LOCATION, DURING THE MONTH OF JUNE, BEGINNING IN 2015. YOUR NEXT SAMPLE SHOULD BE TAKEN IN JUNE 2017. IF THE SYSTEM¿S POPULATION INCREASES TO SERVE 500 PEOPLE OR MORE, THEN THE MONITORING FREQUENCY WOULD AUTOMATICALLY MOVE FROM TRIENNIAL TO ANNUAL MONITORING. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH BOTH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A NE + DS SP TAP DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013