DML FORMALLY APPROVED A STAGE 2 DBP CMP 12/09/2013 FOR THIS SYSTEM. AO1 09/23/2014 REVIEWED AND ASSOCIATED DBP2 SCHEDULE AND SAMPLE PLAN. AO1 02/06/2015
THE STAGE 2 REDUCED MONITORING SUMMARY SHEET WAS APPROVED ON 05/25/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014.
STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED TRIENNIALLY, AT ONE LOCATION, DURING THE MONTH OF JUNE, BEGINNING IN 2015. YOUR NEXT SAMPLE SHOULD BE TAKEN IN JUNE 2017. IF THE SYSTEM¿S POPULATION INCREASES TO SERVE 500 PEOPLE OR MORE, THEN THE MONITORING FREQUENCY WOULD AUTOMATICALLY MOVE FROM TRIENNIAL TO ANNUAL MONITORING.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH BOTH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A NE + DS SP TAP DUAL (TTHM & HAA5)
|