THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN AND SUMMARY SHEET AND MAPS WERE APPROVED ON 07/29/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013, VSSW, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL DURING 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF ONE DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A DURING THE MONTH OF SEPTEMBER).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A LOT 48 DUAL (TTHM & HAA5)
|