THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 6/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2009-2012. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 & 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014 & 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SITE: MIDC DUAL
02-A SITE: MINE CHANGE HOUSE DUAL
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 & 2015.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SITE: MIDC DUAL
|