THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAPS WERE APPROVED ON 06/02/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SCHEDULES AND VERY SMALL SYSTEM WAIVERS (VSSW GRANTED 5/8/07).
IN 2014, STAGE 2 MONITORING CONSISTED OF INDIVIDUAL SAMPLES, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A FOR TTHM DURING THE MONTH OF AUGUST AND 01-A & 02-A FOR HAA5 DURING THE MONTH OF OCTOBER).
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 311 QUARELLI STREET INDIVIDUAL
02-A 510 N. COPPER HILLS LANE INDIVIDUAL
IN 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLES, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A) DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 311 QUARELLI STREET DUAL
02-A 510 N. COPPER HILLS LANE DUAL
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED ANNUALLY, AT ONE LOCATION (01-A) DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 311 QUARELLI STREET DUAL
|