THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 07/18/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013. THE SAMPLE COLLECTED DURING DEC. 2014 AND AUG. 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
FOR 2014, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF DECEMBER.
FOR 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A HAYDEN LAB ¿ 0080 DUAL (TTHM & HAA5)
02-A ENGINEERING LAB - 0090 DUAL (TTHM & HAA5)
***SYSTEM CHOSE TO DO MORE SAMPLES THAN REQUIRED. THE SYSTEM MUST ASK IF THEY WOULD LIKE TO REDUCE NUMBER OF SAMPLE TAKEN***
|