ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0401043

Federal Type:

NTNC

Water System Name:

TUCSON ELECTRIC POWER

Primary Source:

SW

Principal County Served:

APACHE

System Status:

A - MAP

Comments:

Activity Date:

12-01-1984




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 N
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/15/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005-2013, COMPLIANCE MONITORING PLAN, AND THE COMPLIANCE MONITORING PLAN SUMMARY SHEET. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. BEGINNING IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A APPRENTICE SHOP (FORMER ENVIRO SINK) DUAL (TTHM & HAA5) BEGINNING IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (02-A), DURING THE MONTH OF AUGUST. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 02-A CHEM LAB SINK DUAL (TTHM & HAA5) BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST. THE NEXT SAMPLES ARE DUE TO BE TAKEN IN AUGUST 2016. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A APPRENTICE SHOP (FORMER ENVIRO SINK) DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013