THE STAGE 2 COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 06/13/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SAMPLING SCHEDULES, 40/30 CERTIFICATION (GRANTED 10/26/2011), AND STAGE 2 MONITORING RESULTS FOR 2014 AND 2015. THE SAMPLE COLLECTED DURING 2014 AND 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. THE SYSTEM HAS BEEN APPROVED TO TRANSITION FROM ROUTINE MONITORING 2RT/YR UNDER STAGE 2 (10/01/2013 ¿ 12/31/2015) TO REDUCED MONITORING 2RT/3YR UNDER STAGE 2 STARTING 01/01/2016.
FROM 10/01/2013 TO 12/31/2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JUNE.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED TRIENNIALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JUNE.
YOUR SYSTEM NEEDS ONE DUAL SAMPLE SET (TTHM & HAA5) TO BE TAKEN IN JUNE 2018 AND EVERY THREE YEARS AFTERWARDS (JUNE 2021, JUNE 2024, JUNE 2027, ETC.).
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A MCCONE COURT DUAL (TTHM & HAA5)
02-A GOLDEN VALLEY DRIVE DUAL (TTHM & HAA5)
|