THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 06/10/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SAMPLING SCHEDULE, AND 40/30 CERTIFICATION (GRANTED 04/21/2009). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING JULY 2014 AND JULY 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
FROM 10/01/2013 ¿ 12/31/2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 13040 N. MOSS VERBENA ¿ LOT # 119 DUAL (TTHM & HAA5)
02-A 13100 WEST BUTTER BUSH ST DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING CONSISTS OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 13040 N. MOSS VERBENA ¿ LOT # 119 DUAL (TTHM & HAA5)
|