THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET WAS APPROVED ON 7/21/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 DATA , IDSE, AND SUMMARY SHEET. STAGE 2 DATA SUBMITTED BEFORE THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01- A 4105 FORT BRIDGER ROAD DUAL (TTHM & HAA5)
|