THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/27/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013, STAGE 1 REDUCED MONITORING SCHEDULE, AND PUBLIC WATER SYSTEM CLASSIFICATION AS NON-TRANSIENT, NON-COMMUNITY (NTNC). THIS SYSTEM DID NOT MEET THE REQUIREMENTS TO CONTINUE ON REDUCED MONITORING FROM STAGE 1 TO STAGE 2 BECAUSE SAMPLES WERE NOT TAKEN IN 2014. STAGE 2 MONITORING SCHEDULE WILL BEGIN IN AUGUST 2016. BEGINNING 2017 AND MOVING FORWARD, THE STAGE 2 DBP SAMPLING MONTH FOR THIS SYSTEM WILL BE JULY, AS THAT IS THE HISTORIC MONTH OF HIGHEST DBP CONCENTRATION.
IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A KITCHEN SINK DUAL (TTHM & HAA5)
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A KITCHEN SINK DUAL (TTHM & HAA5)
|