THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN AND SUMMARY SHEET AND MAPS WERE APPROVED ON 07/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2012 AND STAGE 2 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL DURING 2014 AND 2015 WILL BE CREDITED TO THE SYSTEM. ADEQ DOES NOT HAVE ANY SAMPLE RESULTS FROM 2014 AND 2015. PLEASE PROVIDE THESE RESULTS TO ADEQ AS SOON AS POSSIBLE.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF ONE DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A DURING THE MONTH OF JULY).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A RANGE MARKET DUAL (TTHM & HAA5)
|