THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP HAVE BEEN APPROVED ON SEPTEMBER 16, 2014. THE APPROVAL WAS BASED UPON THE SYSTEM¿S STAGE 1 DATA FROM 2006-2013.
STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER BEGINNING IN 2014.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH BOTH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE
01-A 13885 N. ZEPPELIN DR. DUAL SAMPLE (TTHM AND HAA5)
PLAN HAS BEEN UPDATED TO SAMPLES TAKEN DURING THE MONTH OF JULY. RC17 03/09/2023
|