THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/1/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED ON 09/24/09) AND STAGE 1 REDUCED MONITORING SCHEDULE. THE SAMPLE COLLECTED DURING JULY 2014 AND 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATION (01-A AND 02-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A MANZANITA INDIVIDUAL (TTHM ONLY)
02-A WHETSTONE INDIVIDUAL (HAA5 ONLY)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATION (01-A AND 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A CATALINA DUAL (TTHM & HAA5)
02-A WHETSTONE DUAL (TTHM & HAA5)
|