THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/1/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) VERY SMALL SYSTEM WAIVER (GRANTED ON 06/19/08) AND STAGE 1 MONITORING SCHEDULES. THE SAMPLES COLLECTED DURING JULY 2014 AND 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SPACE 62 DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF DECEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SPACE 73 DUAL (TTHM & HAA5)
BEGINNING IN 2018, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SPACE 73 DUAL (TTHM & HAA5)
|