THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 5/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 11/24/09) AND STAGE 1 REDUCED MONITORING SAMPLING SCHEDULE (APPROVED 1/24/09) STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL). THIS SYSTEM MET THE REQUIREMENTS TO CONTINUE ON REDUCED MONITORING FROM STAGE 1 TO STAGE 2; HOWEVER, ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016. AS A RESULT, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2014 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2015. THE SAMPLE COLLECTED DURING JUNE AND JULY 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-A, 02-A AND 03-A), DURING THE MONTHS OF JUNE AND JULY.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
|