STAGE 2 REDUCED SUMMARY SHEET AND MAP (RECEIVED 6/25/14) HAVE BEEN APPROVED ON JUNE 22, 2015. DUE TO THE SYSTEM¿S SIZE AND MONITORING HISTORY, THE SYSTEM WAS WAIVED OF THE REQUIREMENT TO SUBMIT A COMPLIANCE MONITORING PLAN. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2007 THROUGH 2012, STAGE 1 REDUCED MONITORING APPROVAL, AND STAGE 2 IDSE VERY SMALL SYSTEM WAIVER (GRANTED 2/28/11).
|