FOR 2014, STAGE 2 ROUTINE MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 03-A), DURING THE MONTH OF SEPTEMBER.
BEGINNING IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ACACIA ¿ JANITOR¿S CLOSET DUAL (TTHM & HAA5)
02-A OVMS ¿ CAFETERIA DUAL (TTHM & HAA5)
03-A ACACIA MAINT-INTER IOC/BUILDING 300 DUAL (TTHM & HAA5)
|