THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 8/3/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013. STAGE 1 SAMPLING SCHEDULE. STAGE 2 DATA WILL BE CREDITED TO THE SYSTEM FOR SAMPLES COLLECTED IN 2014, 2015, AND 2016.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-B), DURING THE MONTH OF JUNE.
2015 SAMPLE WAS TAKEN AT 01-A SITE DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A DISCOVERY CENTER DUAL
|