THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 7/5/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-05, 2008-10, AND 2012-13.
FROM 10/01/2013 ¿ 12/31/2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST. THE SAMPLES COLLECTED DURING AUGUST 2014 AND AUGUST 2015 (PRIOR TO THIS APPROVAL) WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF AN INDIVIDUAL SAMPLE, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A PRIMARY CRUSHER INDIVIDUAL (TTHM)
02-A ADMINISTRATION BUILDING INDIVIDUAL (HAA5)
|