THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 7/5/16. STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 1/28/09) & STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 & 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT ONE LOCATION (SITE 01-A FOR TTHM AND HAA5), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SW - DS SP TAP DUAL (TTHM & HAA5)
IN 2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (SITE 01-A & SITE 02-A FOR TTHM AND HAA5), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SW - DS SP TAP DUAL (TTHM & HAA5)
02-A NE - DS SP TAP DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT ONE LOCATION (SITE 01-A FOR TTHM AND HAA5), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SW - DS SP TAP DUAL (TTHM & HAA5)
|