THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 6/21/16. STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) VSSW CERTIFICATION (GRANTED 5/31/07) & STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 & 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (SITE 01-A FOR TTHM AND HAA5), DURING THE MONTH OF JULY.
IN 2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (SITE 01-A FOR TTHM AND HAA5) DURING THE MONTHS OF AUGUST & SEPTEMBER.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (SITE 01-A FOR TTHM AND HAA5), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 30700 WELLTON-MOHAWK DR. DUAL (TTHM & HAA5)
|