FROM 10/01/2013 - 12/31/2014 ¿ STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (03-A), DURING THE MONTH OF JULY.
FROM 01/01/2015 - 06/31/2015¿ STAGE 2 MONITORING CONSISTED OF AN INDIVIDUAL SAMPLE (TTHM), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JANUARY.
FROM 07/01/2015 - 12/31/2015 ¿ STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS:
- TWO SAMPLES AT 03-A
- ONE SAMPLE AT 04-A
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID
01-A FIRING RANGE
02-A PHYSICAL PLANT BLDG. 16
03-A WTTP LAB
04-A CHEYENNE LS
|