STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 11/20/15. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005 AND 2008, AND DISCUSSIONS WITH THE OPERATOR. STAGE 2 SAMPLES COLLECTED DURING SEPTEMBER 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
|