THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP), CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013 AND STAGE 2 VERY SMALL SYSTEM WAIVER (GRANTED 09/29/2008). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING CONSISTS OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 35710 ANTELOPE DR. DUAL (TTHM & HAA5)
|