ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0402355

Federal Type:

NTNC

Water System Name:

AZ ELECTRIC POWER APACHE

Primary Source:

GW

Principal County Served:

COCHISE

System Status:

A - MAP

Comments:

Activity Date:

06-01-1962




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 AND STAGE 2 MONITORING RESULTS FROM 2005-2015 AND THE ATTACHED COMPLIANCE MONITORING SUMMARY SHEETS. IN 2014 AND 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE LAST WEEK OF THE MONTH OF JULY, AT: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A FRONT OFFICE KITCHEN DUAL (TTHM & HAA5) THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 7/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015. BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE LAST WEEK OF THE MONTH OF JULY. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS WITH THE NEXT SAMPLE DUE IN 2018 (THEN IN 2021, 2024, ETC.). PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A FRONT OFFICE KITCHEN DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013