THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 AND STAGE 2 MONITORING RESULTS FROM 2005-2015 AND THE ATTACHED COMPLIANCE MONITORING SUMMARY SHEETS.
IN 2014 AND 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE LAST WEEK OF THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A FRONT OFFICE KITCHEN DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 7/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE LAST WEEK OF THE MONTH OF JULY. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS WITH THE NEXT SAMPLE DUE IN 2018 (THEN IN 2021, 2024, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A FRONT OFFICE KITCHEN DUAL (TTHM & HAA5)
|