THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET WAS APPROVED ON 7/21/16. SO APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 DATA AND SUMMARY SHEET. STAGE 2 DATA SUBMITTED BEFORE THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2105 E BEAVER CREEK RD DUAL (TTHM & HAA5)
|