THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (WITH EDITS), SUMMARY SHEET AND MAP WERE APPROVED ON 5/27/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013 AND STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) VERY SMALL SYSTEM WAIVER (GRANTED 5/23/08). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING SEPTEMBER 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 7301 E. PARK RIDGE DUAL (TTHM & HAA5)
02-A 7051 ANTELOPE MEADOWS DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 7218 HORIZON WAY DUAL (TTHM & HAA5)
|