THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 6/08/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2009, 2010, 2011, 2012, AND 2013.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 868 TALIA DUAL (TTHM & HAA5)
02-A 2500 HARRIS DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF AN INDIVIDUAL SAMPLE SET (TTHM OR HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 868 TALIA INDIVIDUAL (HAA5)
02-A 2500 HARRIS INDIVIDUAL (TTHM)
|