THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2015. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING SEPTEMBER 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF SEPTEMBER.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A END OF RUNWAY DUAL (TTHM & HAA5)
|