THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN AND SUMMARY SHEET AND MAPS WERE APPROVED ON 06/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013 AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL DURING 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A DURING THE MONTH OF SEPTEMBER AND 02-A DURING THE MONTH OF SEPTEMBER).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 645 S. VERDE SANTA FE PKWY DUAL (TTHM & HAA5)
02-A 1125 FAIRWAY CT. DUAL (TTHM & HAA5)
|