THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 5/19/16. THE MAP NEEDS TO BE SCANNED IN COLOR AND WILL BE SENT IN A SEPARATE E-MAIL. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 REDUCED MONITORING SCHEDULE (2007). ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016. AS A RESULT, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2014 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2015. THE SAMPLE COLLECTED DURING AUGUST 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
|