THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/19/16. SO APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S SITE PLAN, STAGE 1 DATA , VSSW, MAP AND SUMMARY SHEET. STAGE 2 DATA SUBMITTED BEFORE THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (4481 CANYON DRIVE), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01- A 4481 CANYON DRIVE DUAL (TTHM & HAA5)
|