THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP), CMP SUMMARY SHEET AND MAP (TOO LARGE TO ATTACH) WERE APPROVED ON 06/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2012 AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING CONSISTS OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 15 MONTEZONA TRAIL DUAL (TTHM & HAA5)
02-A 150 DIAMOND SKY DUAL (TTHM & HAA5)
NEW SAMPLE POINT ADDED FOR DBP2 SAMPLING WITHIN 5 CONNECTIONS OF THE PREVIOUS SAMPLE POINT. ZS3 4/22/2022
|